Old Freight Station, Tampere

Old Freight Station, Tampere

The relocation of this entire 113-year-old iconic Tampere brick building weighing thousands of tonnes in one piece presented a process that was the first of its kind. The successful execution required in-depth expertise of structural dynamics, precision dimensioning calculations, and careful management of settlement differences during the various stages of the relocation. Compared to mega projects, the project was relatively small in scale, but nonetheless it tested all aspects of engineering skills to their utmost.

Location

Tampere

Client

Tampereen Kaupunki

Services

Architectural and principal design , Bridges and special structures, Structural and element engineering

Size

1 200 m²

Cost

3 M€

Completion

2020

Our other references

Hailuoto bridges and causeway

Hailuoto bridges and causeway

Transfer of Tampere’s freight station, Tampere

Transfer of Tampere’s freight station, Tampere

Hydropower plant fishways

Hydropower plant fishways

Pispala Haulitorni, Tampere

Pispala Haulitorni, Tampere

Hallinoja Bridge - Tampere tram line, Tampere

Hallinoja Bridge - Tampere tram line, Tampere

Isoisänsilta Bridge, Helsinki

Isoisänsilta Bridge, Helsinki