Outokumpu Oyj, F3 extension of the ferrochrome plant, Tornio

Outokumpu Oyj, F3 extension of the ferrochrome plant, Tornio

The F3 project of Outokumpu’s ferrochrome plant was the world’s largest ferrochrome smelting plant and the steel plant with the most integrated operations upon its opening in 2013. The factory area houses the ferrochrome plant, smelting plant, and mills for hot and cold rolling processes. With an extension project, the factory doubled its ferrochrome production to 530,000 tonnes by 2015. In total, 12,000 tonnes of steel structures were required, half of which were used for the smelting plant’s frame. The project used about 70,000 cubic metres of concrete. 

Location

Tornio

Client

Outokumpu Oyj

Services

Industrial structural engineering, Industrial HVAC engineering

Size

42 320 m²

Cost

410 M€

Completion

2013

Our other references

Metsä Fibre, Rauma sawmill, Rauma

Metsä Fibre, Rauma sawmill, Rauma

Wärtsilä, Smart Technology Hub, Vaasa

Wärtsilä, Smart Technology Hub, Vaasa

Turun Seudun Energiatuotanto Oy, NA4 multi-fuel combined heat and power plant, Naantali

Turun Seudun Energiatuotanto Oy, NA4 multi-fuel combined heat and power plant, Naantali

Paperinkeräys Oy, Viinikkala, Vantaa

Paperinkeräys Oy, Viinikkala, Vantaa

Cargotec Finland Oy and NCC Rakennus Oy, Kalmar Technology Center, Tampere

Cargotec Finland Oy and NCC Rakennus Oy, Kalmar Technology Center, Tampere

Valmet Technologies Oy and Lahti Energia Oy, Kymijärvi power plant, Lahti

Valmet Technologies Oy and Lahti Energia Oy, Kymijärvi power plant, Lahti